Sunday, November 11, 2012

University of Maine 2013 Capstone OCC Project

Hey everybody! Just posting up information about our participation along with other OCC suppliers in a project testing the performance of various OCC designs on a few different engine platforms. This project will be performed by the 2013 University of Maine Oil/Vapor Separator Team. LINK





Thanks to:
  
Forest Wentworth
Jonathan Bolduc
Matt Dolan
Dan Mackenzie


I'm excited to have a second party documenting test results and information. They will be trying out one of our latest Dual Chamber OCC with a top swirl pot for the Inlet.

Photos will be posted up shortly.

Believe me, I sent one of our best OCC models  ;D



Saturday, September 15, 2012

Battle Monkey Enterprises Custom


Prototype Dual Stage project, no details are made public yet, but the test platform is a Subaru.
I just wanted to show off a photo  :D

Tuesday, August 14, 2012

Compact Overflow Tank Pic Dump








Just a quick snapshop of another Overflow tank configuration. One of the nipples has a Dip Tube for suction from the bottom. This is customizable as always!

Thanks for looking!

Sunday, August 12, 2012

New Configuration Option Being Added



To offer even more configuration options, this new "Stacked" Inlet style OCC is being added to the product line. A new page will be added soon. It is still the same internal design with one or two Inlets available on the side of the tank.

We'll be updating the website soon!!!


Tuesday, July 24, 2012

WCB5 Track Update


Here is our friend at WCB5 Printing tracking his Audi using a custom Stage 3 type OCC.
Remember, if you need printing, decals, graphics, etc., give them a call!  www.wcb5printing.com  Thanks!

Friday, July 20, 2012

July Pic Dump



Just as it says, here's a post of some memorable custom OCC tanks.

This is why we can't churn them out like many generic brands :D













Wednesday, May 2, 2012

Extra Awesome Response This Year !!!!!

Hi All!


Thank you for spreading the good word, and referring all your friends to our site!
We've been extra busy and working longer hours to keep up!
I appreciate everybody's patience!


Everybody has been very understanding so far! It is AWESOME to work with such great Customers!


I'll keep doing the best I can! Remember each tank is a Custom work!


Thanks again!


Mr. Saikou ^^V

Latest Custom Tank Project


Here is one of the latest very custom tanks! Very different from the standard line, and not a OCC this time. This is a special replacement tank designed per customer specs.
 

The mounting clips were designed and located to fit the customers dimensions.


All panels and clips were hand fabricated and formed.


Beaded nipples per customer's size request.


The filler neck selected is a 51mm billet machined type welded on with 5/16" brass barb relief nipple.

Well, I don't do something like this very often, so I thought I'd post some photos!

It takes a little longer to get something like this done. 
Thanks for your patience Ronny !



Thursday, March 22, 2012

INCREDIBLE DUAL STAGE CONFIGURATION !!!

This could be one of the most badass custom jobs to date! This is a Dual stage OCC sized in the Stage 3 style. This double filters the line and is the of the most extreme systems available anywhere!


Not to mention this Bad Boy is headed to South Africa! Extreme tank for extreme conditions!

Wednesday, March 21, 2012

Current Fabrication Status


Hi All! Just want to thank everybody for spreading the good word to friends and other people on forums all over the World!
2012 is looking to be the most active year yet! GREAT NEWS! This just means that the quality of hand worked custom products is appreciated by people in the know!

We are working extended hours trying to keep pace with the demand, and since custom orders take a little longer, we are falling a little behind and our backlog is reaching the peak summer levels sooner than expected.

I appreciate everybody's patience! I certainly hope I have made everybody aware that we have more orders than normal, and we are doing our best to get them out quick.

Thanks again!

Mr. Saikou ^^V

Sunday, March 4, 2012

Saturday, February 11, 2012

Here we go 2012 !!!!

Hi Everybody! It's that time of year again, so I need to apologize in advance for taking a little longer to reply to e-mails. I always want to answer the same day, but lately it has been taking at least a day.
We answer all e-mails, so if you don't get a reply in 2 days, your spam blocker might be trapping our replies.

*In general new orders are taking a week to fabricate and ship, and this may increase during mid summer!

We'll do our best to get these out to you asap! Thanks for the good word of mouth, and helping Saikou Michi Co. have such a good reputation for Quality !

*UPDATE: February 23-26th e-mails may not be processed until the following Monday

Friday, February 10, 2012

NEW Kia Project Released!


Hi All!

Over the Holiday I had help from a few Great guys from the OptimaForums. There have been alot of details that needed working out, but I think it's all good to go!
There are videos and photos that need to be sorted out, so I will just list the basics that are known, and I will make adjustments when needed.
One note, about the finish, it is high temp Black enamel. There may have been a note posted that it is powdercoated. Not a biggie, but I didn't want anyone to think I am claiming a powdercoated finish.

Kia Optima Connection Sizes: PCV Tank 3/8" IC Tank 1/2"

Kia Optima Brackets:
2011 Uses One Piece Bracket
2012 Uses Welded T Bracket


Prices:
Contact us for current 2013 pricing
2011/2012 IC Tank(Works On Both years, as far as I know)

*Current information says that the tapped holes are for M6mm x 16 screws, which I will include, but I will watch out for anybody that reports different threaded holes.

Postage for One tank is $10
Postage for a Set is $13

*contact us for latest combo pricing

I will update this post whenever I get new information

Thanks! ^^V


Special Thanks to those that have helped in the design process:
Scott Dale
Larry Goldman
Mike Peace

Frank Tulumello


Here is a video for the 2012 Specific PCV tank

(Video by Frank Tulumello)




*Updates June 11, 2012

 Postage for the larger flat rate box, for the pair of tanks is $13

IC tank nipples have been changed to 1/2" after discussing with a professional technician.

Friday, January 13, 2012


2012 is looking like a great year ! Demand has exploded ! I'm working on beautifying the website with new graphics and also updating the product line with new designs !

Thank you for your support !